Academic Building v1
Field stone walls along the north face of the south academic building along future walkways

Metal Stud Framing for Offices on the Bridge between North and South Buildings

Metal stud framing for offices along the Bridge

North Academic Building Central Ave

Steel decking has now been placed for the bridge floor slab

Academic West Elevation

Under-Slab Conduit Stub-Ups in North IT Room

View North from the Bridge

More wood truss joists being placed

South elevation showing steel framing for the bridge roof which links the north and south building halves

Under Slab Vapor Barrier being placed in North Building

Academic Building North Elevation

North Academic Building Roughing in for Electrical Room

Wood truss joists are being placed as part of the roof framing system

Roof framing going up